Water Transfer Pipeline
10 regulatory pathways with auto-routed compliance analysis for California groundwater and surface water transfers.
Pipeline Stages
Every transfer follows a multi-stage compliance pipeline
10 Pathways
Regulatory Pathways
Each transfer type follows a different compliance pipeline based on California water law. The auto-router detects the correct pathway.
SGMA Standard
GWGSA approval and GSP consistency per CWC §10726.4
6 compliance stages
Adjudicated Basin
GWWatermaster approval for court-adjudicated basins
5 compliance stages
Banked Water
GWWithdrawal from previously stored groundwater
4 compliance stages
In-Lieu Transfer
GWSeller reduces pumping, frees surface water
6 compliance stages
Protected Export
GWExport from critically overdrafted basin
7 compliance stages
Pre-1914 Right
SWPre-1914 appropriative — no SWRCB approval needed
5 compliance stages
CVP / SWP Contract
SWFederal/state contract water transfer
4 compliance stages
Post-1914 Temporary
SWSWRCB temporary change petition, ≤1 year
5 compliance stages
Post-1914 Long-Term
SWFull SWRCB long-term change petition
5 compliance stages
Imported Water
SWFewest restrictions — free transfer per CWC §1011
4 compliance stages
Opens the full transfer form with demo scenarios and live API compliance analysis